THE USE OF THE FMEA METHOD FOR QUALITATIVE ANALYSIS OF STEEL BARS

1 INGALDI Manuela
Co-authors:
2 DZIUBA Szymon T.
Institutions:
1 Czestochowa University of Technology, Faculty of Management, al. Armii Krajowej 19b p.309z, 2-200 Czestochowa, Poland, manuela@gazeta.pl
2 Wroclaw University of Economics, Faculty of Engineering and Economics, ul. Komandorska 118-120, 3-345 Wroclaw, Poland, szymon.dziuba@ue.wroc.pl
Conference:
27th International Conference on Metallurgy and Materials, Hotel Voronez I, Brno, Czech Republic, EU, May 23rd - 25th 2018
Proceedings:
Proceedings 27th International Conference on Metallurgy and Materials
Pages:
1996-2001
ISBN:
978-80-87294-84-0
ISSN:
2694-9296
Published:
24th October 2018
Proceedings of the conference were published in Web of Science and Scopus.
Metrics:
562 views / 649 downloads
Abstract

One of the most frequently used methods of quality management in manufacturing and industrial enterprises is the FMEA method. The FMEA (i.e. Failure mode and effects analysis) is a method of systematic prevention of defects. It allows to specify actions to minimize the risk of defects' occurrence. The FMEA is most often used wherever products with a high degree of complexity are manufactured or when the production process is a multi-stage process or when in the production process many people take part. Due to its universal character it is used in mass production, unit production, especially industrial production. The literature states that this method can be widely used in the metallurgical industry. While conducting the FMEA analysis, the knowledge and experience of employees working in higher positions, technologists, employees of quality departments, but also directly production employees can be used, but also it can be treated as a motivation tool for them. The purpose of the paper was to analyze quality of steel bars which are produced by one of the steelwork in Poland. The FMEA method was used for this analysis. The cause and effect are presented for each production problem. After calculating the risk priority number, corrective actions were proposed. After the introduction of these corrective actions, the risk priority number was re-calculated to see if these actions have caused the intended effect.

Keywords: quality, FMEA, risk priority number, steel bars

© This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Scroll to Top