from the conferences organized by TANGER Ltd.
The aim of steelworks macrologistics system to produce steel sheets is to create long-term conditions over the allocation of divisions and layout equipment (aggregates, machines, warehouses, manufacturing strategy), planning system and structure micrologistics system for the smoothest flow of material, maximum capacity utilization of production facilities, meet delivery dates these products of the required quality. Not suitable solution for macrologistics level creates on the micrologistics level situations with conflicting criteria of solution - dilemmas. The article deals with the analysis and solution of three selected logistics dilemmas in production of steel sheet.
Keywords: Micrologistics, logistic dilemma, material flows, metallurgy© This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.