THE IMPACT OF MODERNIZATION ON THE PRODUCTIVITY OF A MULTI-STAGE PRODUCTION OF TRANSFORMER SHEETS

1 MICHLOWICZ Edward
Co-authors:
1 SMOLIŃSKA Katarzyna
Institution:
1 AGH University of Science and Technology, Krakow, Poland, EU,: michlowi@agh.edu.pl, ksmol@agh.edu.pl
Conference:
24th International Conference on Metallurgy and Materials, Hotel Voronez I, Brno, Czech Republic, EU, June 3rd - 5th 2015
Proceedings:
Proceedings 24th International Conference on Metallurgy and Materials
Pages:
1720-1726
ISBN:
978-80-87294-58-1
ISSN:
2694-9296
Published:
12th January 2015
Proceedings of the conference were published in Web of Science and Scopus.
Metrics:
422 views / 160 downloads
Abstract

Production is concerned with short throughput times and high schedule reliability in order to on the one hand, fulfill customer demands and on the other hand, increase planning reliability. However, from the business perspective, it is preferred that the available production equipment is highly utilized and that there is the lowest possible WIP (Work in Process) level. For the evaluation system used in the study TPM method. The TPM method most commonly employs three indicators: MTTR, MTBF and most typically - OEE. The first two are associated exclusively with technical issues of the examined production line. The object of the study was the production plant of transformer sheets. The article presents parts of research OEE performance indicator for many production lines. In particular was examined the impact of modernization of the line on the efficiency.

Keywords: productivity, equipment modernization, efficiency indicator OEE